Bathroom - The Tiling Begins!


Note - Cannot believe I forgot to post this!  I must have hit Save instead of Publish - DOH!!

This is how the bathroom looked at the end of Monday.  The tilers have done all of the pale tiles on the walls and they have done the dark ones around the bath and shower up to half height.  These will be continued up to the top of the wall.

It is great, it is really starting to look like a bathroom now, rather than a room with a sad looking bath in it!!

Wednesday, 15 December 2010

Bathroom - Day Four and Five

I didn't post yesterday as the change in the room was not that drastic as you can see from the photos. In fact the change from day four to the beginning of today is pretty minimal as well.  The photo below shows what the bathroom was like at the beginning of yesterday.  As you can see the completed the plasterwork on the walls and ceiling.  It looks a bit funny because the plaster was still wet when I took the photo.

Now you can play spot the difference!  This is what the bathroom looked like at the beginning of toady!  As you can see, the plaster is now dry so I believe they are looking to start tiling, although I think they are starting on the floor.  Did you spot what they did yesterday?  Probably not but under the window the outflow for the toilet has been sorted.  I am glad this has been done as it was a big job and one of the things that could have held us back.

They currently are having a problem working out what the original plumber did.  Apparently it doesn't make sense as there just seems to be a pipe that goes to no where and they cannot work out what it is for or where it goes at one end.  I think this should serve as a lesson to everyone, be careful who you use for every job when you are refurbishing.  The plumber who did this work is great for fixing pipes etc but we are beginning to find out that he is not the best at actual bathroom or fixture fitting.  So there is my top tip from this, just because someone says they can do something, doesn't mean they can or that they can do it properly.

Ah well, it'll all work out in the end.  Hopefully tomorrow I will be able to show you a photo of the tiling, although if this plumbing issue isn't sorted then who knows... I think I hear some working up there so perhaps they've figured it out....

Monday, 13 December 2010

Day Three of the Bathroom

So this is the beginning of day three of the bathroom refit! I wish this could be a story of our attempts at plumbing and fitting a bathroom but it isn't! Hopefully there will be more stories of DIY as we delve into the redevelopment of the extension. For now we need the bathroom done well and quickly!

So the beginning of day three looks like the picture below (check out the seamless stitching of two photos, I am getting better at it!). Still not much different from the last ones LOL but there is a change. Hopefully after today it may be more obvious, or perhaps not in the photos, but today is the turn of the plasterers and the electrician. So we should have a nice fresh room by the end of the day ready for the tiling and cupboards and things tomorrow.

Our head dude has said that by Tuesday we should be starting to see what it'll look like finished, can't wait. It's always a bit hair-raising doing anything, even painting walls, "Have I picked the right colour?", "Will it look like I imagined?", "What if I hate it?".

We have not gone for overly traditional although we have tried to keep it related with our choice of cupboard doors and taps etc. But it is a modern bath, toilet etc. All those waiting for the reemergence of the free standing footed bath (you know who you are) I am afraid you won't be seeing it here, but watch this space as it may appear later on (I am still fighting the power!) and as we are intending to have another bathroom in the extension I will push again to have this one!

I had originally wanted to re-use the wonderful old bath from the bathroom downstairs (see photo) but there was much resistance from Farm Guy and Farm Dad that it was "too heavy" and "too made of metal" (? Something about losing heat to fast from your bath water). So eventually I agreed that perhaps we should go for another bath, a new one, a modern one. 

Rest assured, however, that I didn't back down on the footed bath without a fight and you will see a nice whirlpool bath going in - a gi-normous one - I gave them a choice "one or the other" I said, "free or ridiculously indulgent".  I expected this to result in the realisation that we could get a free bath but no, and it may have worked in my favour anyway, by them choosing to put a modern one in this bathroom I may end up with both!  Ha HA!! Feminine wiles....

So things are getting exciting here bathroom wise and with about 5 plasterers on the one job it should be getting done pretty darn fast!  

More updates tomorrow.....

Thursday, 5 November 2009

How The Bathroom Progresseth..

The bathroom doesn't look a whole lot different from the original but I assure you there has been major progress. The main problem was that the immersion heater, which was on the wall just as you came in through the door was old and needed replacing. This has now been done, with one about 4 times the size and has been put in a cupboard upstairs, resulting in a nice toasty airing cupboard - see, there is some method to our madness.
The old bathroom suite has been removed, the bath kept - we are hoping to have that re-enameled and use it when we extend the bathroom. We have chosen a pretty plain suite as it was A) not very expensive and B) small! There is a shower unit that needs to be installed, this is being done as we speak.


Once again there is a lot of stuff going on while we chug away at work, it is most frustrating that so much is having to be done while we aren't there. We have both expressed our frustration at not being able to just 'get on with it' ourselves and at having to do everything by phone or trying to explain to someone else what they need to explain to someone else. We are both looking forward to the time that we are moved in and can take real control ourselves.