Showing posts with label Tradesmen. Show all posts
Showing posts with label Tradesmen. Show all posts

Tuesday, 21 December 2010

Bathroom - The Tiling Begins!


Note - Cannot believe I forgot to post this!  I must have hit Save instead of Publish - DOH!!

This is how the bathroom looked at the end of Monday.  The tilers have done all of the pale tiles on the walls and they have done the dark ones around the bath and shower up to half height.  These will be continued up to the top of the wall.

It is great, it is really starting to look like a bathroom now, rather than a room with a sad looking bath in it!!

Monday, 20 December 2010

Bathroom - Beginning of the Second Week

Work begins today in earnest as we only have until Wednesday to get this bathroom done before the bathroom fitters go on holiday for Christmas.  As you can see they got on pretty well on Friday and the bath is now in position, plumbed in and with working electrics...  Just the rest of the room to finish now!

Wednesday, 15 December 2010

Bathroom - Day Four and Five

I didn't post yesterday as the change in the room was not that drastic as you can see from the photos. In fact the change from day four to the beginning of today is pretty minimal as well.  The photo below shows what the bathroom was like at the beginning of yesterday.  As you can see the completed the plasterwork on the walls and ceiling.  It looks a bit funny because the plaster was still wet when I took the photo.

Now you can play spot the difference!  This is what the bathroom looked like at the beginning of toady!  As you can see, the plaster is now dry so I believe they are looking to start tiling, although I think they are starting on the floor.  Did you spot what they did yesterday?  Probably not but under the window the outflow for the toilet has been sorted.  I am glad this has been done as it was a big job and one of the things that could have held us back.

They currently are having a problem working out what the original plumber did.  Apparently it doesn't make sense as there just seems to be a pipe that goes to no where and they cannot work out what it is for or where it goes at one end.  I think this should serve as a lesson to everyone, be careful who you use for every job when you are refurbishing.  The plumber who did this work is great for fixing pipes etc but we are beginning to find out that he is not the best at actual bathroom or fixture fitting.  So there is my top tip from this, just because someone says they can do something, doesn't mean they can or that they can do it properly.

Ah well, it'll all work out in the end.  Hopefully tomorrow I will be able to show you a photo of the tiling, although if this plumbing issue isn't sorted then who knows... I think I hear some working up there so perhaps they've figured it out....

Friday, 10 December 2010

Bathroom - Day Two

So, the guys worked away yesterday putting in wall insulation and putting up the remainder of the plaster board that we had. They also installed the pipes for the sink, radiator, bath, shower and towel rail. With the bad weather they had had problems with getting deliveries of materials through but they did as much as they could.

This is what we were left with at the end of yesterday, doesn't look much different but honestly, there is a change!!  So they arrived bright and early again this morning and have set off again.  An extra body arrived today and so did another van, it looks like the out flow for the toilet is on the cards for today.

My 'home made' panoramic photo didn't work quite as well this time!  You can just make out our neighbours house through the window!!  Give 'em a wave.. Hello!! We SEEEEE you!!





PS Check out the new banner, that is our view down the field - home made panoramic strikes again!!

Thursday, 7 October 2010

How Goes the Nursery

As I have revealed already the room at the top of the stairs is more than just a bedroom, its a Nursery. I have been planning the nursery theme for a while and am going with a Farm theme! It was a fight between Jungle and Farm and farm won, as there are so many Jungle themes already out there! The first thing we needed to do was make the wall that splits the existing room. Farm Dad and Farm Guy made huge progress with that, so much so that we managed to get a plasterer in while I was in the hospital!

The plasterer made a fantastic job! The finish on the walls can only be described as feeling like glass, it was amazing to paint on and meant we have an amazingly smooth finish on the paint! The first step was to paint some blue for the sky.





After painting the sky I added some hills with green and painted that green all the way down to the skirting board - or at least to where the skirting board is going to be! For those worried I am not actually doing any of the painting, I have some great helpers actually doing the work while I recover from the hospital. All I have actually done paint wise was the top of the hills! The green on the picture looks quite dull, it is in fact called 'Spearmint' and is quite bright and cartoony!

Next step put on the skirting and door and get it all wood stained. Then on with the next step of the painting....

Friday, 20 November 2009

When The Cat Went Up the Chimney...

Our cat Monty featured in such posts as: Cartoon Cat & Upside Down Cat is a scaredy cat in the perfect sense. He is particularly bright but his first reaction with anything, and I do mean ANYTHING, is to run away. He runs away and then immediately turns back and goes to investigate the new thing, this includes his mum (me), his brother, cat food tins, strange paper bags and whenever Farm Guy stands up. This has got him in many scrapes, including being stuck up a tree, locked in the shed and in the attic and under the bed. In his latest exploit the scary-thing was one of the tradesmen, come round to collect his pay.
Farm guy answered the door and dealt with the monetary issue (I spend, he pays!! :O) ). He then came up the stairs to where I was laboriously painting the bedroom wall.
'Think Monty's up the chimney' says Farm Guy 'He's completely disappeared.'
We both troop down, while I think, I have no idea how to get a cat out of a chimney! Luckily we arrive in the living room to see what is now a completely black cat emerging from the chimney asking what the fuss was about. Phew!
Monty was given 24 hours to clean himself up (which he didn't, Monty isn't into personal hygiene) so I just had to wipe his face and neck cos I couldn't bear to see him looking such a state: although admittedly he didn't look much better after his wipe down!

At least he's black and grey now rather than black and black!

Thursday, 5 November 2009

How The Bathroom Progresseth..

The bathroom doesn't look a whole lot different from the original but I assure you there has been major progress. The main problem was that the immersion heater, which was on the wall just as you came in through the door was old and needed replacing. This has now been done, with one about 4 times the size and has been put in a cupboard upstairs, resulting in a nice toasty airing cupboard - see, there is some method to our madness.
The old bathroom suite has been removed, the bath kept - we are hoping to have that re-enameled and use it when we extend the bathroom. We have chosen a pretty plain suite as it was A) not very expensive and B) small! There is a shower unit that needs to be installed, this is being done as we speak.


Once again there is a lot of stuff going on while we chug away at work, it is most frustrating that so much is having to be done while we aren't there. We have both expressed our frustration at not being able to just 'get on with it' ourselves and at having to do everything by phone or trying to explain to someone else what they need to explain to someone else. We are both looking forward to the time that we are moved in and can take real control ourselves.